...
Home » Chengdu Global Trade Plaza (Power Cables)

Chengdu Global Trade Plaza (Power Cables)

The cable supply project for Chengdu Global Trade Plaza (B1 plot) involves providing the necessary power cables for two office buildings, B01# and B02#. These cables will be used for tasks including design, supply, manufacturing, transportation, testing, assembly, management, technical guidance, warranty, acceptance, and delivery. This project is crucial for ensuring the proper functioning of the power and lighting systems within these commercial buildings.

Technical Requirements

The cables used will adhere to the latest electrical safety standards, featuring fire resistance, high-temperature resistance, and corrosion resistance, ensuring long-term reliability, safety, and efficient operation. The cables will be manufactured using advanced processes and will comply with international safety standards, guaranteeing the stable operation of the building’s electrical system under any circumstances.

Quality and Service

  • Design and Engineering:

    Provide technical support to ensure the correct selection and installation of cables.

  • Supply and Manufacturing:

    Manufacture cables according to the technical specifications.

  • Transportation and Delivery:

    Ensure the timely delivery of cables to the construction site.

  • Testing and Quality Assurance:

    Conduct comprehensive testing before and after installation to ensure the reliability of the cables and compliance with safety standards.

  • Installation Support and Technical Guidance:

    Provide technical guidance to the installation team to ensure the correct installation of cables.

  • Post-Installation Services:

    Offer ongoing maintenance, support, and warranty services after installation to ensure the long-term stability and performance of the cable system.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.